New pier at Schiphol

A-pier

Ballast Nedam/TAV has been involved in the construction of the new A-Pier in a Joint Venture (50/50). On November 29, 2021, the collaboration of Ballast Nedam/TAV and Schiphol Group has ended.

  • 400 metres length
  • 3 floors
  • 57,000 m2 pavement
Return to