Baltic 2 Offshore Wind Farm

A total capacity of 288 MW at 32 kilometres from the coast

Second offshore wind farm in the German Baltic Sea

Ballast Nedam has installed 39 monopiles and provided the logistics between the feeder port in Rostock and the Baltic 2 offshore wind farm.

  • 39 monopiles
  • 80 wind turbines
The EnBW Baltic 2 offshore wind farm is the second offshore wind farm in the German Baltic Sea. The wind farm is located about 32 km north of Rügen Island in the western part of the Baltic Sea. With a total of 80 wind turbines of 3.6 MW each, EnBW Baltic 2 has a total capacity of 288 MW.

More information?

Ronald de Geus

Managing Director Ballast Nedam Infra Projects

Ronald grew up in an international environment: the basis of his career in integral projects. From his design and engineering background, he has grown into the project management of large, complex projects.

Business Unit Director Ronald De Geus Ballast Nedam Infra Projects
Return to