New Building for Erasmus Medical Centre
In the heart of Rotterdam we built a new future proof academic hospital on a tiny construction site, right next to another hospital that will remain operational during construction. This is a once in a lifetime opportunity according to the board of the Erasmus Medical Centre. The design therefore requires the highest standards in functionality, appearance, hygiene, safety and construction. A great challenge for us.
-
120 metre high office tower
-
300 metre longs glass roofed area
Hospital operational during construction
Logistical puzzle
More information?
Halbe Veenstra
Managing Director Ballast Nedam Building Projects
Since March 1, 2021, Halbe holds the position of Managing Director at Ballast Nedam Building Projects. He is responsible for the realisation of construction projects and the satisfaction of clients and stakeholders are the primary concern.
